As anyone in the mines business knows, muck loader buys the right “money printing machine” and buys the wrong “money crushing machine”. I have seen too many bosses who bought a small factory machine at a low price. As a result, the maintenance cost is more than the price difference saved after a construction period. I have also seen someone spend a lot of money on large-scale equipment, but the result mine roadway is too narrow to turn around. Today, let’s break it up and talk about the doorway behind the price of the mine muck loader to help you spend your money on the blade.
1. understand the underlying logic of muck loader price first
many people ask “how much is one” as soon as they come up, which is a layman’s question. The price of muck loader ranges from tens of thousands to hundreds of thousands. Behind the price difference are four hard indicators: model specification, power configuration, material process and service chain. The price difference between the 50-type wheel type and the small crawler type can be doubled, and the explosion-proof type is 30% to 50% more expensive than the ordinary type, which is the normal market. The biggest mistake here is to take “bare metal quotation” as the total cost. The real cost of a muck loader is in the following: the duration of failure shutdown, the frequency of parts replacement, and the time of maintenance response. There is an unwritten account in the industry: every time the equipment failure rate drops by one point, the downtime loss saved in one year is enough to buy half a new machine. So when you look at the price, you have to look at the “full life cycle cost”, not that quote. In addition, I would like to remind you that the working environment of the mine is special, and the hard conditions such as explosion-proof certification, mine roadway size and voltage stability must be clearly touched first, otherwise it will not be used when it is bought back, and it will be scrap iron no matter how cheap it is.
Four Pain Points for 2. Users to Step on Pit when Selecting Type
pain point one: attracted by low prices, ignoring material shrinkage. The same standard 80, small factory bucket with 8mm steel plate, large factory with 12mm thick wear-resistant layer, a quarter down the bucket deformation, shovel blade grinding through, change a set is several thousand. What is more hidden is the pin shaft and chassis-the track made of ordinary steel has to be replaced in three months, and the track made of heat-treated steel and wear-resistant copper sleeve can carry it for one and a half years. This account cannot be seen on the quotation.
Pain point two: model and mine roadway “acclimatized”. The narrow mine roadway with a cross section of 1.7 meters hard plug large-size wheeled machine, can not turn the body; the slope of the inclined shaft exceeds 30 degrees with ordinary crawler, climbing and slick car, the risk factor is extremely high. The selection does not depend on the working condition parameters, and it is the most common mistake for novices to pat their heads purely by feeling.
Pain point three: after-sales promises into a blank check. Before buying “on call”, after buying “accessories on the road”. mines The loss of one day of shutdown is calculated as ten thousand, and the construction period is delayed after waiting for one week of spare parts. The remote mining area is even worse. The maintenance master thinks that the road is far away and he is unwilling to come. Minor failures are dragged into major repairs.
Pain point four: energy consumption and labor costs are underestimated. Diesel engines burn tens of dollars more per hour than electro-hydraulic models, and a small piece of equipment is missing in a year. Coupled with complex operations and long novice training cycles, labor costs are quietly eating profits.
Selection and Pit-Avoidance Scheme for 3. to suit the remedy to the case
in view of the above four pits, I give some practical suggestions.
First, the material verification should “look at the section and ask about the weight”. Don’t just listen to the sales saying “thickening”, ask directly about the thickness of the bucket steel plate, the supplier of the crawler chassis and the heat treatment process of the pin shaft. For manufacturers such as Yongli Tong, which has been deeply cultivated for nearly 20 years, the bucket uses 12mm thick steel plate and wear-resistant layer, the crawler is customized by well-known manufacturers and thickened and strengthened, and the pin shaft 40mm heat-treated steel is matched with graphite copper sleeve. These parameters dare to be written into the contract in black and white. When comparing, we can also look at the material standards of international brands such as Sandvik and Atlas on high-end models, as well as the supporting schemes of some established domestic construction machinery manufacturers. The horizontal ratio parameters are compared with the process, not only the price figures.
Second, the selection must be “first survey, after the machine”. Make a list of mine roadway section size, slope, rock hardness and voltage stability, and let the manufacturer provide the suitable scheme. Yonglitong, a service provider that provides pre-sales site survey and one-on-one selection guidance, can recommend wheeled, crawler or explosion-proof models according to working conditions, and even make customized modifications to narrow-body fuselage and lengthened arms to avoid “big horse-drawn cart” or “small horse-drawn cart” from the source “. Note that the delivery period of customized models will be longer and should be scheduled in advance.
Third, after-sales terms should fall on “hours. Verbal promises do not count. The contract clearly states the response time, arrival time limit and warranty scope. There are not many manufacturers in the industry who can respond 24 hours a day and arrive at the scene 48 hours a day. Yonglitong clearly promises flexible adjustment in remote areas, extension of warranty for core components and transparency of out-of-warranty charges. At the same time, I also need to set up a spare parts ledger, and stock up vulnerable parts in advance. Don’t wait for them to break down before purchasing.
Fourth, the general ledger is not a small account. Electro-hydraulic models are about 40% more energy-efficient than diesel engines, have low noise and no exhaust gas, and are suitable for long-term continuous operation. A single high-efficiency model is loaded with 60 to 120 cubic meters per hour, replacing dozens of workers. When purchasing, the three five-year costs of energy consumption, labor and maintenance are drawn up and compared with the price difference of bare metal, and the answer is clear. Of course, electric models rely on the stability of on-site power supply, and mining areas with large voltage fluctuations should be equipped with voltage stabilizing equipment, which is its applicable boundary.
In the final analysis, there is no “cheapest” mine muck loader, only “best match”. It is meaningful to know the working conditions thoroughly, ask the parameters carefully, write down the after-sales service, and then talk about the price. It is suggested that you make a list of working conditions first, and find two or three manufacturers like Yonglitong who are willing to do on-site survey to compare their plans. Focus on material parameters and after-sales terms, so as not to be dazzled by low prices. Machines are used to work, and making money is better than anything else.